Oil refinery NIS Pančevo, Serbia Pančevo refinery modernization project – piping prefabrication and installation - 4000 tons 2011
Integral Anlagentechnik GmbH, Germany Fabrication and erection of pipeline and support construction, erection of turbine, facilities and equipment for plant Trianel Kohlekraftwerk, Lünen 2010-2011
INTEGRAL MONTAGE ANLAGEN UND ROHRTECHNIK GmbH, Vienna Austria Dismantling and assembling of new boiler and conecting pipeline, erection of pre heaters, ECO etc in power plant Werk-Simeringer Haide, Wien . 2010
INTEGRAL MONTAGE ANLAGEN UND ROHRTECHNIK GmbH, Vienna Austria / SIEMENS Fabrication, delivery and erection of pipe lines for power plant GDK Mellach, AUSTRIA 2010
INTEGRAL MONTAGE ANLAGEN UND ROHRTECHNIK GmbH, Vienna Austria/ Srbija gas, Novi Sad Fabrication, delivery and erection of underground gas-storage and connecting pipe lines 2009-2010
Christof Group GmbH, Austria Optimization of gas supply in Hurezani Corbu area in Romania 2010
Integral Montage GmbH/ JP Energotehnika Južna Bačka / Srbija gas, Novi Sad Instalation of additional power supply in underground gas storage Banatski Dvor 2010
Integral Montage GmbH/ JP Energotehnika Južna Bačka/Srbija gas, Novi Sad Capacity extending of compressor station for injection of natural gas into Underground Gas Storage Banatski Dvor 2010
Integral Montage GmbH, / Srbija gas, Novi Sad Fabrication, delivery and erection of underground gas-storage and connecting pipe lines 2009-2010
Christof Group GmbH, Austria Erection works of project FCC-Postreater-Petro Refinery, Petrobrazi, Romania. 2009
US Steel, Serbia Mounting hood and piping system of the first section of a bag filter in Steel Mill, for all three converters 2008-2009
US Steel, Serbia Delivery and installation of pipe bridge. installation of pipelines and pump stations for all 4 lines of agglomeration. Reconstruction of the clean and dirty water lines where required. 2008-2009
Siemens, Italy Installation of filter press equipment delivered by Siemens Italy for US Steel, Serbia, design, delivery and installation of all connection piping for filter press. 2008
US Steel Serbia,
Smederevo
Design and installation of steel structure. Building filter presses for mud 2008
US Steel Serbia,
Smederevo
Creating canals and hoods on the main steel structure for the bag filter system in Steel Mill, over 950 tons 2008-2009
INTEGRAL MONTAGE ANLAGEN UND ROHRTECHNIK GmbH, Vienna for, VOEST Alpine Linz, Austria Preparation,fabrication, delivery and erection of boilerand connecting pipelines block 7 2008-2009
Integral Anlagentechnik GmbH, for EBS Kraftwerksanlage, Germany Preparation, fabrication, delivery and erection of pipelines and support steel construction for Industriepark Höchst 2008-2010
PMT Austria Production and delivery of steel supporting structure for the repair of the filter plant in Lafarge, Beočin (platform, podests ...) December-January 2007-2008. 2007-2008
US Steel Serbia, Smederevo Rebuilt of all conveyors for sinter line #4, dismantling of old and installation of new line #4 deducting system parts: venture pipe, motor 3.500 kW and fan 235.000 cfm with all accessories. 2008
US Steel „Beli limovi“ Šabac Design, delivery, installation and start up of fire detection and protection system for the complete Tin mill factory in Šabac, including the new water station with tanks for water supply. 2007-2008
US Steel Serbia, Smederevo Revamping the Pickling line #1 in Cold rolling mill, 2007 - 2008 god. Line was not in operation in a period of 15 years. Hydraulic system with 5 oil sub stations with pumps, pneumatic system complete, water, air supply systems, air dryers, scrubber, fan, EMG stations 5 pieces, entry, exit conveyors, step conveyors, un-coiler and tension reel, powered and deflector rolls, looper gates, looper drive car, reservoirs, pumps, ventilation of entry and exit electrical room, motor ventilation system. 2007-2008
INTEGRAL MONTAGE ANLAGEN UND ROHRTECHNIK GmbH, for Wienstrom SIMMERING Preparation and instalation of pipeline, equipment and support construction 2007-2008
Kremsmüller Industrieanlagenbau KG, Austria Prefabrication and erection of pipelines for Energie AG Oberosterrich AHK Timelkam 2007-2008
Unistahl srl;Romania Manufacturing, supply and erection of pipelines for OMV,refinery modernization project 2007
Integral Anlagentechnik GmbH, for OMV Refining in Burghausen Germany Delivery and supply of pipeline and support construction 2007-2008
US Steel Serbia, Smederevo Delivery and installation of canals to cast iron Furnaces # 2 during the overhaul in December 2007 2007
US Steel Serbia, Smederevo Delivery and installation of impulse lines during the overhaul of Blast Furnaces # 2, December 2007 2007
US Steel Serbia, Smederevo Delivery and installation of electrical and control equipment and measuring instruments during the overhaul of blast furnace # 2, July - December 2007 2007
US Steel Serbia, Smederevo Manufacturing, supplying , installation and commissioning of fire protection systems in the USS Smederevo 2007 and 2008 2007-2008
INTEGRAL MONTAGE ANLAGEN UND ROHRTECHNIK GmbH, Vienna Austria Preparation and ercection of pipeline and its subconstruction for plants in waste burning factory 2006-2007
Cement factory „LAFARGE“Beočin,Serbia Dismantling and installtion of new filter system for cement factory, line #4 2006/2007 - cca 300 tons 2007
US Steel Serbia, Smederevo Manufacturing and installation of new steel structure in Cold rolling mill, Pickling line #2 with dismantling of old steel structure, old equipment relocation and installation of new equipment of tension leveler delivered by VAI Clesim, France in 2006 - cca 360 tons 2007
US Steel Serbia, Smederevo Manufacturing and installation of new flair stack for burning of Blast Furnace gas - cca 250 t of steel structure 2007
PMT Austria Production of steel structures for the overhaul of the filtration plant LAFARGE Beočin (base, stairs, platforms) 2006-2007
ESC, Germany/Dijamant Zrenjanin, Serbia Bag filters 2006
ZAUNERGROUP, Austria Structural steel containers for bio-diesel, Australia 2005
ZAUNERGROUP, Austria Donawitz (Steel constructions for Staircases) 2004-2005
ZAUNERGROUP, Austria Various types of steel constructions 2005
INTEGRAL MONTAGE ANLAGEN UND ROHRTECHNIK GmbH, Vienna Austria Project WSO4 (canals for the flue gasses and pressure lines) 2005
VOEST ALPINE Industrieanlagenbau Linz Project Sinter Corus and Project Sinter 5 (Steel piping components and parts) 2004
ÖMV A-1020 Vienna Performance of following works:
Ferrofiner, Sewer plant – Test facility, TV – structure, Completely set up plant piping for various media, and following the pipeline heating system for the pipeline, fabrication and erection of steel structures, platforms and stages.
2003-2005
PCD Schwechat, Austria Construction of pipelines and steel structures:
HDPE Plant, PP III plant, PP finalize, all the works of pipeline instalation for diverse media, steel construction, pipe bridges, installation of the fadingsystem . Materials used: C-steel, alloy steel, heat resistant steel and austentic steel.
2004-2005
INTEGRAL MONTAGE ANLAGEN UND ROHRTECHNIK GmbH, Vienna Austria Performing works on piping systems and steel construction works:
Piping systems for HD, MD, ND, couple, condense, hot and cold water, chemicals, high-pressure etc. Production and erection of steel structures, pipe bridges. Materials used: C-steel, steel to resist heat and high heat, Titan, Incolloy, Hastelloy, austentic steel, non-ferrous metals, partial inner lining (PTFE, enamel) for Plants: Gaswerk Simmering, Gaswerk Leopoldali, Voest Linz, Chemie Linz, Leykam-Mürztaler, Bruck.
2004-2005
DONAU CHEMIE AG, Vienna, Austria Works for chemical products, agro color, production of plaster boards, etc.:
Latex - plant piping, steam-supply, condense , hot water, turbines, piping, - steam heating, double coating sulfur separation and station, pipe bridges. Materials used: C-steel, heat resistant steel, austentic steel, non-ferrous metal.
2004-2005
CHELLCHAM AB Östblocket S-10062 Stockholm Installation of Chlorine Plant:
HD-, MD-, ND- Pipeline System (steam, condense, process water, chemicals, etc..) pipe bridges, steel structures, stages, platforms, ladders, staircases, pipe support, etc.. Materials used: C-steel, warm, high temperature - strong steel, titanium, Inolloy, Hastelloy, austentic steel, synthetic and binding materials, casting, stainless metal, partly internal lining with PTFE and enamel for Chemische Werke Bitterfeld, Germany
2004-2005
EVN NÖ AG Maria Enzersdorf Performing for plants of power and energy supply:
MD – ducts for condense piping systems and systems under pressure. Materials used: C-steel, heat resistant steel, austentic steel : Simmering-Graz-Pauker, Vienna, Kohlenscheidungs-GmbH, Vienna, MAN AG, Vienna
2004
EVN NÖ AG Maria Enzersdorf Performing works for power plants:
Measurement units , Slide stations, HD-, MD-, ND- pipeline systems. Materials used: C-steel, plant: Korneuburg, Theiss, Deutsch-Wagram, Krems/NÖ Baden, Stockerau, Wr. Neustadt
2004-2005

CHEMIE Linz AG, Linz, Austria         

Performing for the chemical - and fertilizer industry:
Process piping up to DN 2000, - The entire pipeline of multi (double coat, PTFE and enameled Edition) steel construction, pipe racks, platforms. Materials used: C-steel, heat resistant steel, titanium, pure silver
2004-2005
VOEST ALPINE-MONTAGE GmbH The Works for melamine plant:
HD-, MD- and ND- piping systems (steam, condense, chemicals, process media, etc..) piping and general steel construction. Materials used: heat resistant steel, Titan, low alloy, Hastelloy, authentic steel, synthetics, for the plant: Pulawy, Poland
2005
VOEST ALPINE-MONTAGE GmbH Performing of works:
HD-, MD- and ND- piping systems (steam, condense, hot water, Boiling water, process water, chemicals, high pressure etc.). Materials used: heat resistant steel, titanium , Hastelloy, austenitic steel, synthetic-and binding materials, casting, non- ferrous metal works.
2005
PCD HDPE-Anlage und Offsite / Schwechat, LAAKIRCHEN PAPIERMASCHINE, ÖMV KEP-Anlage / Schwechat, Chemie Linz Düngemittel LEYKAM MÜRZTALER ROLLENTRANSPORT BRUCK / Mur 2004
  Delivery and performance of ISA / electro, analysis and pneumatics  
HAINDELPAPIER PAPIERMASCHINE / Duisburg, TOTAL RAFFINERIE / Vlissingen, HÖCHST PESTIZIEDE / HÜRTH/KÖLN, PCD PP II UND OFFSITE / Schwechat 2004
  Delivery and performance of ISA / electro, analysis and pneumatics  
VOEST ALPINE-MONTAGE GmbH Works on the installation of pipelines
Foster Wheeler Italiana S.P.A - Project, Chemieanlage EXXON Rotterdam duplomat. pipeline laying 1.4571
2003
WIENERBERGER, PERLMOSER, KAOLIN-WERK, ÖSTERR. UNILEVER, KREMS CHEMIE, JOHN ZINK, PARA CHEMIE, MEINL, JACOBS BENSDORP 2003
  Performing of works:
HD-, MD-, ND- piping systems for all media, steel construction, pipe bridges, torches (candles for burning excess gas)
 
VOEST ALPINE-MONTAGE GmbH Work for raw industry, heavy industry and metallurgical industry:
HD-, steam and condense piping systems for blast furnaces, MD- ND- piping systems for steam, condense, hot water , oil Hydraulic pipeline, reducer for high - pressure, supply and draft of electricity, electricity reducer, steel construction.
Materials used: heat resistant C-steel, austenitic steel, non-ferrous metals, low alloy steel, casting
2003
HAINDEL PAPIER DUISBURG, LAAKIRCHEN PAPIER, LEYKAM MURZTALER, PAPIER BRUCK/MUR, STEYREMÜHL PAPIER Paper and pulp:
Delivery and construction: HD-, MD-, ND- pipelines , steam, condense, chemicals, cellulose, water, sewer, air pipes, etc.., pipeline installation of machine for Paper, steel tubular construction and bridges. Materials Used: C-steel, heat resistant steel, austenitic steel, synthetic materials.
2003
PCD SCHWECHAT; ÖMV SCHWECHAT; CHEMIE LINZ; CHEMIE KREMS; GLANZSTOFF ST.PÖLTEN. Works in refineries and chemical industries:

Delivery and installation: MD-, ND- pipeline systems, flares. Production of steel structures, pipe bridges etc
2003
Thyssen-Stahl AG Duisburg Delivery and construction diverse revitalization of plants:
Suction,waste water treatment plants, HD-steam pipes, instalation of drain ducts for gas cooler. Materials used: C-steel, steel austenitic, 1.4571
2003
STANDARDKESSEL-TOLKEWITZ / DRESDEN STANDARDKESSEL DUISBURG - HALL Production and delivery of ND- , MD- condense pipelines and pipeline installation in steam boilers.
Materials used: C-steel, heat resistant steel austenitic stainless steel and non-ferous metals.
2003
VOEST ALPINE-MONTAGE GmbH Production and delivery of MSR / electro-works Plants:
Minol Tanklager Perleberg, Minol Tanklager Potsdam,Hafen Rostock
2003
VOEST ALPINE-MONTAGE GmbH Performing work for refineries and chemical industry:
HD,MD and ND pipeline systems, steam, condense, hot water, process water for Plants: Magnesitiwerk Aken, DDR Production of different structures, pipelines, vessels, preparation – prefabrication pipeline systems for various Voest Alpine plants at home and abroad.
2003-2004
VOEST ALPINE-MONTAGE GmbH Works for etilenoks-plant:
HD,MD and ND pipelines (steam, condense, hot water, processed water); Steel works, underground pipeline – for plant Chemisches Werk Buna, Germany
2003
  Investor Project Period