| Oil refinery NIS Pančevo, Serbia | Pančevo refinery modernization project – piping prefabrication and installation - 4000 tons | 2011 |
| Integral Anlagentechnik GmbH, Germany | Fabrication and erection of pipeline and support construction, erection of turbine, facilities and equipment for plant Trianel Kohlekraftwerk, Lünen | 2010-2011 |
| INTEGRAL MONTAGE ANLAGEN UND ROHRTECHNIK GmbH, Vienna Austria | Dismantling and assembling of new boiler and conecting pipeline, erection of pre heaters, ECO etc in power plant Werk-Simeringer Haide, Wien . | 2010 |
| INTEGRAL MONTAGE ANLAGEN UND ROHRTECHNIK GmbH, Vienna Austria / SIEMENS | Fabrication, delivery and erection of pipe lines for power plant GDK Mellach, AUSTRIA | 2010 |
| INTEGRAL MONTAGE ANLAGEN UND ROHRTECHNIK GmbH, Vienna Austria/ Srbija gas, Novi Sad | Fabrication, delivery and erection of underground gas-storage and connecting pipe lines | 2009-2010 |
| Christof Group GmbH, Austria | Optimization of gas supply in Hurezani Corbu area in Romania | 2010 |
| Integral Montage GmbH/ JP Energotehnika Južna Bačka / Srbija gas, Novi Sad | Instalation of additional power supply in underground gas storage Banatski Dvor | 2010 |
| Integral Montage GmbH/ JP Energotehnika Južna Bačka/Srbija gas, Novi Sad | Capacity extending of compressor station for injection of natural gas into Underground Gas Storage Banatski Dvor | 2010 |
| Integral Montage GmbH, / Srbija gas, Novi Sad | Fabrication, delivery and erection of underground gas-storage and connecting pipe lines | 2009-2010 |
| Christof Group GmbH, Austria | Erection works of project FCC-Postreater-Petro Refinery, Petrobrazi, Romania. | 2009 |
| US Steel, Serbia | Mounting hood and piping system of the first section of a bag filter in Steel Mill, for all three converters | 2008-2009 |
| US Steel, Serbia | Delivery and installation of pipe bridge. installation of pipelines and pump stations for all 4 lines of agglomeration. Reconstruction of the clean and dirty water lines where required. | 2008-2009 |
| Siemens, Italy | Installation of filter press equipment delivered by Siemens Italy for US Steel, Serbia, design, delivery and installation of all connection piping for filter press. | 2008 |
| US Steel Serbia, Smederevo |
Design and installation of steel structure. Building filter presses for mud | 2008 |
| US Steel Serbia, Smederevo |
Creating canals and hoods on the main steel structure for the bag filter system in Steel Mill, over 950 tons | 2008-2009 |
| INTEGRAL MONTAGE ANLAGEN UND ROHRTECHNIK GmbH, Vienna for, VOEST Alpine Linz, Austria | Preparation,fabrication, delivery and erection of boilerand connecting pipelines block 7 | 2008-2009 |
| Integral Anlagentechnik GmbH, for EBS Kraftwerksanlage, Germany | Preparation, fabrication, delivery and erection of pipelines and support steel construction for Industriepark Höchst | 2008-2010 |
| PMT Austria | Production and delivery of steel supporting structure for the repair of the filter plant in Lafarge, Beočin (platform, podests ...) December-January 2007-2008. | 2007-2008 |
| US Steel Serbia, Smederevo | Rebuilt of all conveyors for sinter line #4, dismantling of old and installation of new line #4 deducting system parts: venture pipe, motor 3.500 kW and fan 235.000 cfm with all accessories. | 2008 |
| US Steel „Beli limovi“ Šabac | Design, delivery, installation and start up of fire detection and protection system for the complete Tin mill factory in Šabac, including the new water station with tanks for water supply. | 2007-2008 |
| US Steel Serbia, Smederevo | Revamping the Pickling line #1 in Cold rolling mill, 2007 - 2008 god. Line was not in operation in a period of 15 years. Hydraulic system with 5 oil sub stations with pumps, pneumatic system complete, water, air supply systems, air dryers, scrubber, fan, EMG stations 5 pieces, entry, exit conveyors, step conveyors, un-coiler and tension reel, powered and deflector rolls, looper gates, looper drive car, reservoirs, pumps, ventilation of entry and exit electrical room, motor ventilation system. | 2007-2008 |
| INTEGRAL MONTAGE ANLAGEN UND ROHRTECHNIK GmbH, for Wienstrom SIMMERING | Preparation and instalation of pipeline, equipment and support construction | 2007-2008 |
| Kremsmüller Industrieanlagenbau KG, Austria | Prefabrication and erection of pipelines for Energie AG Oberosterrich AHK Timelkam | 2007-2008 |
| Unistahl srl;Romania | Manufacturing, supply and erection of pipelines for OMV,refinery modernization project | 2007 |
| Integral Anlagentechnik GmbH, for OMV Refining in Burghausen Germany | Delivery and supply of pipeline and support construction | 2007-2008 |
| US Steel Serbia, Smederevo | Delivery and installation of canals to cast iron Furnaces # 2 during the overhaul in December 2007 | 2007 |
| US Steel Serbia, Smederevo | Delivery and installation of impulse lines during the overhaul of Blast Furnaces # 2, December 2007 | 2007 |
| US Steel Serbia, Smederevo | Delivery and installation of electrical and control equipment and measuring instruments during the overhaul of blast furnace # 2, July - December 2007 | 2007 |
| US Steel Serbia, Smederevo | Manufacturing, supplying , installation and commissioning of fire protection systems in the USS Smederevo 2007 and 2008 | 2007-2008 |
| INTEGRAL MONTAGE ANLAGEN UND ROHRTECHNIK GmbH, Vienna Austria | Preparation and ercection of pipeline and its subconstruction for plants in waste burning factory | 2006-2007 |
| Cement factory „LAFARGE“Beočin,Serbia | Dismantling and installtion of new filter system for cement factory, line #4 2006/2007 - cca 300 tons | 2007 |
| US Steel Serbia, Smederevo | Manufacturing and installation of new steel structure in Cold rolling mill, Pickling line #2 with dismantling of old steel structure, old equipment relocation and installation of new equipment of tension leveler delivered by VAI Clesim, France in 2006 - cca 360 tons | 2007 |
| US Steel Serbia, Smederevo | Manufacturing and installation of new flair stack for burning of Blast Furnace gas - cca 250 t of steel structure | 2007 |
| PMT Austria | Production of steel structures for the overhaul of the filtration plant LAFARGE Beočin (base, stairs, platforms) | 2006-2007 |
| ESC, Germany/Dijamant Zrenjanin, Serbia | Bag filters | 2006 |
| ZAUNERGROUP, Austria | Structural steel containers for bio-diesel, Australia | 2005 |
| ZAUNERGROUP, Austria | Donawitz (Steel constructions for Staircases) | 2004-2005 |
| ZAUNERGROUP, Austria | Various types of steel constructions | 2005 |
| INTEGRAL MONTAGE ANLAGEN UND ROHRTECHNIK GmbH, Vienna Austria | Project WSO4 (canals for the flue gasses and pressure lines) | 2005 |
| VOEST ALPINE Industrieanlagenbau Linz | Project Sinter Corus and Project Sinter 5 (Steel piping components and parts) | 2004 |
| ÖMV A-1020 Vienna | Performance of following works: Ferrofiner, Sewer plant – Test facility, TV – structure, Completely set up plant piping for various media, and following the pipeline heating system for the pipeline, fabrication and erection of steel structures, platforms and stages. |
2003-2005 |
| PCD Schwechat, Austria | Construction of pipelines and steel structures: HDPE Plant, PP III plant, PP finalize, all the works of pipeline instalation for diverse media, steel construction, pipe bridges, installation of the fadingsystem . Materials used: C-steel, alloy steel, heat resistant steel and austentic steel. |
2004-2005 |
| INTEGRAL MONTAGE ANLAGEN UND ROHRTECHNIK GmbH, Vienna Austria | Performing works on piping systems and steel construction works: Piping systems for HD, MD, ND, couple, condense, hot and cold water, chemicals, high-pressure etc. Production and erection of steel structures, pipe bridges. Materials used: C-steel, steel to resist heat and high heat, Titan, Incolloy, Hastelloy, austentic steel, non-ferrous metals, partial inner lining (PTFE, enamel) for Plants: Gaswerk Simmering, Gaswerk Leopoldali, Voest Linz, Chemie Linz, Leykam-Mürztaler, Bruck. |
2004-2005 |
| DONAU CHEMIE AG, Vienna, Austria | Works for chemical products, agro color, production of plaster boards, etc.: Latex - plant piping, steam-supply, condense , hot water, turbines, piping, - steam heating, double coating sulfur separation and station, pipe bridges. Materials used: C-steel, heat resistant steel, austentic steel, non-ferrous metal. |
2004-2005 |
| CHELLCHAM AB Östblocket S-10062 Stockholm | Installation of Chlorine Plant: HD-, MD-, ND- Pipeline System (steam, condense, process water, chemicals, etc..) pipe bridges, steel structures, stages, platforms, ladders, staircases, pipe support, etc.. Materials used: C-steel, warm, high temperature - strong steel, titanium, Inolloy, Hastelloy, austentic steel, synthetic and binding materials, casting, stainless metal, partly internal lining with PTFE and enamel for Chemische Werke Bitterfeld, Germany |
2004-2005 |
| EVN NÖ AG Maria Enzersdorf | Performing for plants of power and energy supply: MD – ducts for condense piping systems and systems under pressure. Materials used: C-steel, heat resistant steel, austentic steel : Simmering-Graz-Pauker, Vienna, Kohlenscheidungs-GmbH, Vienna, MAN AG, Vienna |
2004 |
| EVN NÖ AG Maria Enzersdorf | Performing works for power plants: Measurement units , Slide stations, HD-, MD-, ND- pipeline systems. Materials used: C-steel, plant: Korneuburg, Theiss, Deutsch-Wagram, Krems/NÖ Baden, Stockerau, Wr. Neustadt |
2004-2005 |
CHEMIE Linz AG, Linz, Austria |
Performing for the chemical - and fertilizer industry: Process piping up to DN 2000, - The entire pipeline of multi (double coat, PTFE and enameled Edition) steel construction, pipe racks, platforms. Materials used: C-steel, heat resistant steel, titanium, pure silver |
2004-2005 |
| VOEST ALPINE-MONTAGE GmbH | The Works for melamine plant: HD-, MD- and ND- piping systems (steam, condense, chemicals, process media, etc..) piping and general steel construction. Materials used: heat resistant steel, Titan, low alloy, Hastelloy, authentic steel, synthetics, for the plant: Pulawy, Poland |
2005 |
| VOEST ALPINE-MONTAGE GmbH | Performing of works: HD-, MD- and ND- piping systems (steam, condense, hot water, Boiling water, process water, chemicals, high pressure etc.). Materials used: heat resistant steel, titanium , Hastelloy, austenitic steel, synthetic-and binding materials, casting, non- ferrous metal works. |
2005 |
| PCD HDPE-Anlage und Offsite / Schwechat, LAAKIRCHEN PAPIERMASCHINE, ÖMV KEP-Anlage / Schwechat, Chemie Linz Düngemittel LEYKAM MÜRZTALER ROLLENTRANSPORT BRUCK / Mur | 2004 | |
| Delivery and performance of ISA / electro, analysis and pneumatics | ||
| HAINDELPAPIER PAPIERMASCHINE / Duisburg, TOTAL RAFFINERIE / Vlissingen, HÖCHST PESTIZIEDE / HÜRTH/KÖLN, PCD PP II UND OFFSITE / Schwechat | 2004 | |
| Delivery and performance of ISA / electro, analysis and pneumatics | ||
| VOEST ALPINE-MONTAGE GmbH | Works on the installation of pipelines Foster Wheeler Italiana S.P.A - Project, Chemieanlage EXXON Rotterdam duplomat. pipeline laying 1.4571 |
2003 |
| WIENERBERGER, PERLMOSER, KAOLIN-WERK, ÖSTERR. UNILEVER, KREMS CHEMIE, JOHN ZINK, PARA CHEMIE, MEINL, JACOBS BENSDORP | 2003 | |
| Performing of works: HD-, MD-, ND- piping systems for all media, steel construction, pipe bridges, torches (candles for burning excess gas) |
||
| VOEST ALPINE-MONTAGE GmbH | Work for raw industry, heavy industry and metallurgical industry: HD-, steam and condense piping systems for blast furnaces, MD- ND- piping systems for steam, condense, hot water , oil Hydraulic pipeline, reducer for high - pressure, supply and draft of electricity, electricity reducer, steel construction. Materials used: heat resistant C-steel, austenitic steel, non-ferrous metals, low alloy steel, casting |
2003 |
| HAINDEL PAPIER DUISBURG, LAAKIRCHEN PAPIER, LEYKAM MURZTALER, PAPIER BRUCK/MUR, STEYREMÜHL PAPIER | Paper and pulp: Delivery and construction: HD-, MD-, ND- pipelines , steam, condense, chemicals, cellulose, water, sewer, air pipes, etc.., pipeline installation of machine for Paper, steel tubular construction and bridges. Materials Used: C-steel, heat resistant steel, austenitic steel, synthetic materials. |
2003 |
| PCD SCHWECHAT; ÖMV SCHWECHAT; CHEMIE LINZ; CHEMIE KREMS; GLANZSTOFF ST.PÖLTEN. | Works in refineries and chemical industries: Delivery and installation: MD-, ND- pipeline systems, flares. Production of steel structures, pipe bridges etc |
2003 |
| Thyssen-Stahl AG Duisburg | Delivery and construction diverse revitalization of plants: Suction,waste water treatment plants, HD-steam pipes, instalation of drain ducts for gas cooler. Materials used: C-steel, steel austenitic, 1.4571 |
2003 |
| STANDARDKESSEL-TOLKEWITZ / DRESDEN STANDARDKESSEL DUISBURG - HALL | Production and delivery of ND- , MD- condense pipelines and pipeline installation in steam boilers. Materials used: C-steel, heat resistant steel austenitic stainless steel and non-ferous metals. |
2003 |
| VOEST ALPINE-MONTAGE GmbH | Production and delivery of MSR / electro-works Plants: Minol Tanklager Perleberg, Minol Tanklager Potsdam,Hafen Rostock |
2003 |
| VOEST ALPINE-MONTAGE GmbH | Performing work for refineries and chemical industry: HD,MD and ND pipeline systems, steam, condense, hot water, process water for Plants: Magnesitiwerk Aken, DDR Production of different structures, pipelines, vessels, preparation – prefabrication pipeline systems for various Voest Alpine plants at home and abroad. |
2003-2004 |
| VOEST ALPINE-MONTAGE GmbH | Works for etilenoks-plant: HD,MD and ND pipelines (steam, condense, hot water, processed water); Steel works, underground pipeline – for plant Chemisches Werk Buna, Germany |
2003 |